The Foundry, Newcastle

With students set to arrive in September, a brand-new accommodation facility was vital to meet demand to house over 200 students in Newcastle city centre. The footprint and location of the city centre site had to be carefully considered to avoid disruption and time certainty was essential to open in time for the start of term.

Nottingham University

blank

A new special educational needs facility was required at Nethergate Academy in Nottingham – an Ofsted Outstanding special school for children with autism, learning difficulties and disabilities

UCL – John Dodgson House

blank

With increasing student intake in the city, University College London needed to expand their existing facilities to provide more accommodation and living space. With spare land expensive and hard to come by, a roof top extension to an existing 1950’s-built college building, located opposite St Pancras Station in Central London, was needed.