Project::

Taylor Wimpey

Sector: :

Construction

Site Programme::

2 Weeks

Hire Period::

110 Weeks

Taylor Wimpey East London required a new building to house their Project Team and Operatives for Phase 3 of the Eclipse Development. Their footprint was limited to a narrow section of the site which meant they only required a 6m wide building.

Eclipse is an exciting new collection of one, two and three-bedroom apartments and duplex apartments located in the highly desirable and vibrant area of Walthamstow, London.

Taylor Wimpey chose Premier’s Transline Plus product due to its 2.7m ceiling height, robust and high quality materials used and the excellent working environment provided by the modules.

Due to their long track record of skilled project management and experience in city centre locations, Premier Modular Limited supplied a two storey building comprising a commercial kitchen, canteen, W/C’s with showers, meeting rooms, store room, kitchenette, and an open plan office. The Transline Plus is aesthetically pleasing and is being used by 200 Operatives and 12 Office Staff.

With the majority of work carried out at Premier’s East Yorkshire factory we were able to erect the building on site within one week, causing minimum disruption to the ongoing development and surrounding area.

Downloads

Back to case studies

Get in touch

Premier Modular Limited

Catfoss Lane, Brandesburton, East Yorkshire,
YO25 8EJ

Registered in England and Wales No 2487565

0800 316 0888
.(JavaScript must be enabled to view this email address)

Useful Information