Site Programme:

1 Week

Hire Period:

62 Weeks

Premier Modular Limited provided Mace with 231m² of temporary office and welfare accommodation for use by the Construction company whilst they worked on a 16000 sq ft premium office development overlooking St Paul's Cathedral on Cannon Street.

Due to the site being so close to St Paul’s Cathedral and the ongoing development in this central location, limited space was available; Premier’s solution to overcome this challenging site was to provide a building comprising 8 bays over 4 storeys built on a gantry over the pavement to minimize footprint usage.

With the majority of work carried out at Premier’s East Yorkshire factory we were able to erect the building on site within one week, causing minimum disruption to the ongoing development and surrounding area.

Premier won this project due to their existing relationship with Mace, where they have been able to demonstrate their ability to deliver quality design and service as well as their capability to provide multi-storey complex projects.

Downloads

Back to case studies

Get in touch

Premier Modular Limited

Catfoss Lane, Brandesburton, East Yorkshire,
YO25 8EJ

Registered in England and Wales No 2487565

0800 316 0888
.(JavaScript must be enabled to view this email address)

Useful Information