Project:

Icknield Lower School Extension

Sector:

Education

Value:

560,000

Site Programme:

6 Weeks

After the client viewed our completed scheme at Mission Grove School, being impressed by the architectural look and the build quality produced, Premier Modular Limited was selected as preferred supply chain partners to work with Icknield Lower school to develop a new scheme incorporating 4 classrooms as a 2 storey extension.

The client requested that Premier develop a contemporary styled scheme that would give a feeling of real quality on the school site.

The whole extension had to be constructed within the school summer holiday period and Premier completed over 70% of the building offsite in their state of the art factories in East Yorkshire. This allowed for a seamless transition to site in Dunstable, where Premier was able to complete the building within 6 weeks.

Testimonial

Premier responded to the many challenges and constraints that this constricted site imposed and delivered on time, within a 5 week on-site programme and within the agreed predetermined budget - an excellent quality product. Considerable effort, time and care was taken throughout to respond to the design initiative and intent and school’s needs. The school and governors are delighted with the result and would thoroughly recommend Premier’s professional approach, services and expertise to all those within the education sector.

Downloads

Back to case studies

Get in touch

Premier Modular Limited

Catfoss Lane, Brandesburton, East Yorkshire,
YO25 8EJ

Registered in England and Wales No 2487565

0800 316 0888
.(JavaScript must be enabled to view this email address)

Useful Information