Home / Insights / Case Studies / Wembley Technical College
The largest of three projects Premier Modular Ltd were successful in securing for the London Borough of Brent (acting as a key supply chain partner for ISG Construction Ltd) Premier provided a full new Primary School on a dedicated area at the bottom of the existing school site, consisting of three 2-storey buildings and a single storey block.
The scheme had to be installed on a constrained site within the fully operational school. Cranage of the modules was timed for the school holidays to further minimise disruption.Careful logistics planning and traffic management ensured access to the school was maintained throughout the construction programme.