Poole Hospital Endoscopy Community Diagnostic Centre

Client Dorset NHS Hospitals Trust / designed by P+HS Architects
Solution Permanent
Size Three storeys, 1647m2
Install time 15 Months

Brief

Supporting growing healthcare demand

To meet growing demand for endoscopy and diagnostic services, University Hospital Dorset (UHD) at Poole Hospital and Dorset NHS Trust needed to expand its facilities to provide Dorset patients with an equitable, safe, timely endoscopy service.

Following a successful tender through the NHS SBS framework, Premier Modular was appointed as Principal Contractor to deliver a permanent, full turnkey Community Diagnostic Centre (CDC) for Endoscopy at Poole Hospital. Working with its appointed architectural partner, P+HS Architects, Premier Modular brought together the design, manufacture and installation of the state-of-the-art facility on the existing Parkview House site.

The development of CDC, opening in October 2026, will help address the existing backlog created during the COVID-19 pandemic and create additional capacity to manage increased referrals, while supporting the extension of the screening programme to include people aged 50 and over.

The three-storey facility features six endoscopy suites, six procedure rooms, associated clinical support spaces, decontamination units, plus training and seminar rooms, with the potential for future expansion into a dedicated training centre.

By creating additional clinical capacity and connecting seamlessly to the existing hospital, the project will provide long-term value for the Trust while improving access to essential diagnostic services for the local community.

“Throughout the project, the Premier Modular team were responsive, solution-focused and collaborative. They worked closely with the Trust and wider project team to understand our requirements and find effective solutions to the challenges of delivering a major development on a constrained hospital site. Premier Modular has been an important partner in delivering this project, and we would be very happy to work with them again.”

Mark Howell, Estates Capital Project Manager, University Hospitals, Dorset

Challenges and solutions

Managing a complex live hospital environment

Delivering the project on the constrained Parkview House site, within a live hospital environment, required careful planning and careful coordination throughout the construction programme. The site is around 3.8m lower than the main hospital, so our design team developed a three-storey split level building, aligning the lower ground floor level with Churchfield Road and the upper ground floor with the main hospital. This allows CDC to connect seamlessly with the hospital while providing easy patient access from Churchfield Road with a staff stair and lift core to connect the levels.

The site also presented a number of logistical challenges, including local traffic restrictions in Poole, complex traffic management measures needed to safely reverse delivery wagons into the site, and existing underground services. Deliveries were carefully coordinated, with installation carried out in two phases to accommodate services diversion and minimise disruption to hospital operations.

Existing trees adjacent to the site also had to be retained and protected. Working with an arboriculturist, the team planned the words around the trees, including limited pruning and a void within the lower ground floor to accommodate the roots.

The road opposite the site was closed during construction to support safe working, while regular communication with neighbouring residents helped minimise disruption.

Together, these challenges required close collaboration between the project team, the Trust and the local community throughout every stage of delivery.

Building features

Manufactured at Premier Modular’s factory in East Yorkshire, the modules are built and partially fitted out in a controlled, protected environment. With work carried out in consistent conditions, quality can be monitored throughout the manufacturing process, with checks made as each module progresses through production and fit-out before being transported to site. The approach supports consistency across the building and reduces the need for remedial work on site. Wherever possible, locally sourced materials are used, supporting UK suppliers and reducing transportation impacts.

The new facility combines modern clinical spaces with a contemporary appearance that both integrates seamlessly with the existing hospital estate and provides scope for future expansion:

  • A three-storey building with 59 modules – arranged across ground and lower ground floor levels to make the most of the ground’s sloping topography.
  • Six endoscopy suites and associated clinical rooms – alongside a dedicated decontamination unit, training room and seminar room.
  • 7m suspended ceilings throughout – providing spacious, airy rooms.
  • Enhanced soffits – to carry medical pendants between suites.
  • Green cladding, brickwork and large windows in communal and office spaces – creating a contemporary façade that meets planning requirements.
  • A covered walkway – linking the new facility directly to the existing hospital for easy movement between buildings.
  • Integrated building services – connecting the new facility seamlessly with the wider hospital infrastructure.
  • Large punched windows in offices and seminar spaces – providing staff with plenty of natural light and views outside.

Sustainable construction

Sustainability was built into the project from the outset, with the building achieving a BREEAM Excellent rating. The design takes a whole-life approach to sustainability, with a Life Cycle Assessment informing decisions around embodied carbon and material selection. It also incorporates Life Cycle Costing to assess long-term value and efficiency.

The approach follows a ‘lean, mean, green’ philosophy. It’s designed to be ‘lean’ through passive design principles and thermal modelling, helping to reduce energy demand while making a comfortable environment. Air source heat pumps and smart energy monitoring help cut energy demand and keep building services running smoothly.

The ‘green’ element comes in the form of photovoltaic (PV) panels on the plant room roof, which generate renewable electricity on site.

Its sustainability goes beyond energy efficiency, too, with water-saving fittings and leak detection helping to reduce water use. During construction, energy, water, waste and transport impacts were monitored to keep resource use in check.

The design also accounts for future climate risks, with improved ventilation, indoor air quality and acoustics to create a wellbeing-first environment for patients and staff. Ecological enhancements delivered a 109% increase in ecological value under the BREEAM assessment.

The project also makes efficient use of the existing hospital estate by redeveloping the Parkview House site and connecting the new facility directly to the hospital.

Ultimately, Premier Modular has provided University Hospital Dorset NHS Foundation Trust with a flexible building solution that can accommodate future expansion as clinical needs evolve.