Home / Insights / Case Studies / Douay Martyrs Catholic School
“We were very keen to minimise any interruption to the children’s learning from the redevelopment and following the pandemic, so providing a comprehensive facility for in-person teaching and social interaction were key priorities for the school.”
“Premier’s classrooms give us all the facilities we need for the next year, and pupils and staff were able to move in without any disruption to their education.”
“This was a challenging project but Premier engaged in the design development and at every stage of the scheme. This meant that despite its complexities, the project went very smoothly. A lot of openness and collaboration was required between the two building suppliers, which they managed very well.”
Premier was awarded the contract to supply the decant classrooms under a rental arrangement.Limited space on site meant that the best location for this accommodation was on top of the new modular extension. This involved installation of the temporary facilities while the permanent building was under construction.
In total, 36 bespoke modules were installed on this highly constrained school site.
The decant accommodation provided general classrooms, an IT suite, science laboratories with a shared preparation room, and spaces for special educational needs.
To provide access, Premier installed both a platform lift and internal staircases which interface seamlessly with the permanent building.
Premier also constructed a single storey ancillary building to provide interim school offices. This required temporary foundations and an accessible timber ramp.
By providing the decant facilities under a bespoke rental arrangement, the Department for Education could provide the best possible learning environment for Douay Martyrs’ pupils during the school redevelopment.
The project was completed on time and budget with just three months on site. This enabled pupils and staff to move into the new classrooms and avoid any disruption to teaching and learning.
An unusual and complexed brief for our hire fleet, the Premier team took a flexible approach, delivering a bespoke decant building that serviced multiple faculties. The collaboration between the delivery team was extensive to ensure minimal disruption and optimal delivery from both sides.
This was a highly technical modular project, and winner of the 2023 MMC Awards for “Use of MMC Construction Methods in Temporary Accommodation”.