Skip to main content

Project:

Teddington Healthcentre

Sector:

Healthcare

Value:

£1.6m

Site Programme:

18 Weeks

Premier Modular Limited were chosen to provide a new two storey Health and Social Care Centre in conjunction with a main contractor. The client Richmond and Twickenham NHS Primary Care Trust picked Premier due to our past healthcare experience and our collaborative design approach.

The new Care Centre covers 1,471m² and contains a mix of office accommodation for the Social Services department, clinical space for a dental practice and a reception area, this meant that HTM standards had to be adhered to in parts of the building.

The exterior finish of the building was a combination of coloured Kingspan ribbed panels, brick slip and render, with powder coated entrance canopy and brise soleil’s adding attractive features to the building. A contrasting bright orange feature entrance adds a warm, welcoming and modern feel.

Richmond and Twickenham Primary Care Trust commissioned a post-construction stage NEAT Assessment of the completed Teddington Memorial Hospital in accordance with the NEAT (NHS Environmental Assessment Tool) methodology. Based on this, the development achieved a postconstruction stage NEAT rating of ‘excellent’. 

Downloads

Back to case studies

Get in touch

Premier Modular Limited

Catfoss Lane, Brandesburton, East Yorkshire,
YO25 8EJ

Registered in England and Wales No 2487565

0800 316 0888
.(JavaScript must be enabled to view this email address)

Useful Information