Project:

Central Saint Giles

Sector:

Construction

Site Programme:

4 Weeks

Hire Period:

156 Weeks

Premier was approached to provide temporary welfare and office facilities for the construction phase of the E450 Central Saint Giles project.

Due to the limited and narrow space available Premier came up with a building that was 60m x 6m over 3 levels which was situated along Dyott Street, which was closed for the duration of the project.

The building itself catered for 600 operatives, 60 staff and consists of 34 Interlink modules. Premier provided office space, high spec toilets and washroom facilities, locker and changing rooms, canteen and a fully fitted kitchen.