Skip to main content

Working as a partner of Conlon construction in the North West, Premier are part way through constructing a new school at New Islington. This scheme, being delivered for the EFA, is a far reach from most people’s view of a modular scheme.

Premier’s innovative approach and flexible design capability ensured that this complex, high quality, building can be delivered at the competitive rates demanded by the EFA to achieve their cost and quality standards. David commented ‘Having just visited site I was impressed by our speed of install and the accuracy of our construction methods. Witnessing the blend of our 3D modular approach for the main classrooms, alongside our 2D panelised approach to create the hall area, I was struck by the true flexibility of our systems; rooftop play areas, two storey lightwells and some fabulous architectural features. I am sure the EFA will be delighted by the finished school in a few weeks and we look forward to further assignments with them.’

Get in touch

Premier Modular Limited

Catfoss Lane, Brandesburton, East Yorkshire, YO25 8EJ

Registered in England and Wales No 2487565

0800 316 0888
.(JavaScript must be enabled to view this email address)

Useful Information