Some disturbing statistics were published in ‘Construction News’ on the 14th November 2014. Only 46% of Construction projects are completed on time or better and only 75% awarded 8 out of 10 or higher for value for money. These areas are two of the key drivers for use of Offsite technology.

Our company complete on time as a matter of course because the factories run to a pre planned drum beat. This drum beat is at the core of the Business principles and drives all the pre construction activities. It is the very nature of a lean manufacturing process that allows continual on time delivery. Manufacturing within a controlled environment is another key driver to high quality and value for money.

We put significant effort into rigorous Quality Control and are proud to have just handed over six of the last eight MOD buildings defect free.

Get in touch

Premier Modular Limited

Catfoss Lane, Brandesburton, East Yorkshire, YO25 8EJ

Registered in England and Wales No 2487565

0800 316 0888
.(JavaScript must be enabled to view this email address)

Useful Information