Roundhay School Primary

Roundhay School Primary Campus

SECTOR

Education

SIZE

Two-storeys, 2,360m2

SiTE Programme

37 Weeks

BUILDING SOLUTION

Permanent

BRIEF

A bespoke, hybrid approach was needed to meet the demands of Leeds City Council and to allow for the development of one of the city’s first ever through schools. With an urgent requirement for their new primary campus, we were appointed to tackle this complex and challenging scheme to expand Roundhay School quickly and efficiently.

The CHALLENGES

• The changing levels of the site proved a design challenge, requiring innovative and flexible off-site solutions 

• As an existing school, it was important that time on-site was kept to a minimum to reduce any disruption 

• As an urgent requirement, production and build time needed to be minimal 

The solution

With differing levels of terrain throughout the site, we used innovative design and were able to combine a mixture of building methods to create a completely bespoke package that worked best for the school. 
Offsite construction allowed for the speedy delivery of the project, enabling us to build on the existing campus with minimum disruption, meaning the school could be opened as soon as possible. The size and nature of the school now means that pupils will be offered security and support throughout the whole of their academic lives.

RESULTS

Ensuring the client could access new facilities as soon as possible, Roundhay Primary was developed and delivered within 37 weeks.
Since the build, the school has been able to provide education for a range of students, from ages 4 to 18.

This innovative new way of learning gives the students chance to explore a wider range of facilities and presents both students and teachers access to greater opportunities and development. 

GET IN TOUCH WITH US

Let’s talk about your educational space

Whether you’re ready to get a quote or need some help and advice, we’re here to help.

Related Case Studies